Sorry for the delay in posting. We are moving right along with the framing process. As of this morning, all walls are up, doors and windows have all been framed out, OSB has been put up around most of the exterior of the house, and ceiling joists have been laid over the entire house, excluding the garage. WOW! Pretty good for it just being Wednesday! They will be working on rafters for the roof for the rest of this week and into next week.

We have, once again, made a few modifications to the layout of the house, this time with the patio door. In this pic, there are two openings on both sides of what will be our fireplace. The plans originally called for these to be windows and the patio door to be in the breakfast room. (to the left) We have since change that to a window in the breakfast room and the door to be in the great room on the left (pic) with a matching 'stationary door' on the right. We made this decision because we felt it would be a better use of space, thinking that a door in the breakfast room could get in the way of our table and chairs. All in all, I think it was a good decision, and there was no extra labor or materials involved, since we made the decision before doors and windows were framed.
As of tomorrow (Thursday) We hope to have all our decisions made on shingles and brick and get that ordered right away. They will be needing it before we know it!
Below are a few pics from this morning:
Looking into garage
Looking through kitchen to breakfast room
Looking through back window in breakfast room